[:en]Tyas Murni Puji Astutik   Abstract   The objective of the research was to describe and analyze the rises and subside of PT. Kertas Leces Probolinggo in 1990-2014 by studying the history of the company through socio-economic approach. The problems are formulated as following: (1) How were the dynamics of Paper Factory Leces Probolinggo before 1990; (2) What factors caused the ups and downs of Paper Factory Leces Probolinggo until...
Read More
[:en]Siti Hasanah     ABSTRACT     This research discusses the Women in Two Worlds (The Existence of Women Workers at PTPN XII Pancur Angkrek in the Year 1998-2012) in the village of Sumbercanting, Botolinggo District, Bondowoso viewed from the economic aspect and the division of roles of women workers. The aim of this study was to explore, to examine critically, and to describe analytically the background of the women...
Read More
[:en]Sita Murti   ABSTRACT This study analyses some issues related to the representation of orientalism discourse between Australia as the West and Indonesia as the East. The construction is represented in Indo Dreaming through its characters. This study uses the theory of Edward Said’s Orientalism which focuses on how the West sees the East through discursive stereotype construction. The goal of this research is to dismantle the construction of orientalism....
Read More
[:en]Shobibah Turrohma   ABSTRACT   This research uncovers power represented by Abraham Lincoln as the main character in Lincoln movie. For uncovering the power representation by Lincoln, theory of Discourse Analysis combined with Systemic Functional Linguistics Focusing on the transitivity, mood and modality analysis by Halliday (1994) are applied. The theory of power by Fairclough (1989) is also applied to know the power represented by Lincoln in this movie. This...
Read More
[:en]Rodiatam Mardiyah   ABSTRACT The construction of Wonorejo Dam was inspired by the importance of dam for flood control and irrigation in Tulungagung regency as well as water supply for Surabaya City. Its construction was carried out by the Directorate General of Water Resources within two periods: the first period was in 1982-1985, and the second period was in 1992-2002. The dam construction was once terminated in 1985-1991 due to...
Read More
1 142 143 144 145 146 259